亚洲欧美激情在线-久久久久99精品成人片小说-一级做a爰片久久免费-亚洲国产成人最新精品-日韩香蕉电影AV_中文字幕aa大全_日本欧美亚洲影院

Contact Us

Industrial Ventilation Fan tips

Date: 2014-10-13   Click: 1589 Times

Before "Industrial Ventilation Fan" installation
1, the fan should be checked before installing it is intact, fastener bolts are loose or fall off, if collisions impeller cover. Carefully check the fan or blinds during transport without deformation damage.
2, the installation select export environment, you should pay attention to the socket can not have too much ~ ~ face obstacles in 2.5-3M's.
When "Industrial Ventilation Fan" installation
A smooth installation: the installation should pay attention to the horizontal position of the fan, the fan and mounting the motor to adjust to a solid foundation can not have tilted horizontal plane.
2, the fan should be installed so that the motor in position adjustment bolts, easy to operate. Adjust the belt tension when convenient to use.
3, when installing the fan bracket, be sure to let stand firm and level ground plane, reinstall the angle iron reinforcement if necessary, the next fan.
4, after installing the fan, check the tightness around. If this gap is, the available solar panels sealed plastic or glass.
After installation "Industrial Ventilation Fan"
1, after the installation is complete, check the internal fan to stay estate tools and debris. Hand or toggle lever blades, check whether tight or collision phenomenon, whether the project did not interfere with the rotation of the test run before the exception.
2, in operation, if there is vibration or fan motors have "buzz" abnormal sounds or other anomalies, should stop to check, repair, and then get started.

Back to: Industry news

+86-0769-83660708

Home Product News Contact